Tangra Golf Club Residence
Tangra golf is a high-quality off-plan development which captures the best of both worlds. Skiing in the winter and Golf in the summer. The development is located just 100 metres from the 18-hole signature Ian Woosenam designed Pirin Golf and Country club. The development will house luxury modern apartments, townhouses and a luxury hotel. South facing apartments will have views over the golf course and the stunning Pirin and Rila mountain ranges. You will also see the Rhodopi mountains to the east.

Hot Offer:
- Guaranteed rental income of 5% per year for 3 years
- Full Furniture Package
- Payment plan 35% deposit, nothing to pay until completion (limited availability)
Facilities:
• Own gardens for the townhouses
• Reception
• 2 restaurants
• 1 shop
• Indoor swimming pool
• Outdoor swimming pool
• Laundry room
• Ski-lockers
• Conference room
• Childrens golf course
• Playing room for children
• Beauty saloon
• Qualified attendance staff
• 24 hour room service
• Car park
• Security and video-surveillance provided
• 24 Hour Shuttle bus to the ski lifts
The onsite Spa Centre will include:
• Gym
• Sauna
• Massage
• Jacuzzi
Finishing:
Entrance Hall
• floor – terracotta or granite slate titling
• ceiling – latex finish
• walls – latex finish
• lighting elements
Bathroom
• floor – terracotta or granite slate titling
• walls – floor-to-ceiling tiles
• electric heater
• sanitary unit – toilet, sink and mixing tap, shower cubicle or bathtub
• accessories
• lighting elements
Living Room/Bedroom
• floor – laminate
• walls – latex finish
• PVC window paneling
• lighting elements
Kitchen
• floor – terracotta or granite slate tiling
• walls – latex finish
• sink cupboard
• electric oven
• refrigerator
• lighting elements
Balcony
• floor – granite slate tiling
• wood-finish railing
General:
• heating with economy electrical radiators or fireplace
• MDF internal doors
• Decorative finish metal front doors
• Possibility for Cable TV
• Possibility for telephone line
• Lighting elements include switches and ceiling/wall fittings
Construction Schedule:
- Foundations: June 2006
- Completion of Roofing: Sept/Nov 2006
- Protocol 15: Oct/Dec 2007
- Protocol 16: Feb/March 2008
Payment Plans:
|
Deposit |
Roof |
Act 15 |
Act 16 |
Discount |
|
|
A |
30% |
30% |
30% |
10% |
|
|
B* |
35% |
- |
60% |
5% |
5% |
*Only available when purchasing 4 or more units.